paint·day

Is it good to coat in Bloomington, MN this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Bloomington, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Wed (Good to go)
ThuCAUTION
83°/71°
Dew margin
10.1°F
Overnight dew
Low
Rain
15%
Window
9am–5pm

High humidity (86%, over the 85% mark) slows drying — keep an eye on the cure window.

FriRISK
83°/68°
Dew margin
1.5°F
Overnight dew
High
Rain
48%
Window

High condensation risk overnight — surface dips to within 1.5°F of the 67°F dew point (low 67°F, 100% cloud, 8 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

SatRISK
83°/67°
Dew margin
10.4°F
Overnight dew
Low
Rain
16%
Window

Rain likely in the 24h cure window (16% chance, ~1.1mm) — it can wash out or mar an uncured coat.

SunCAUTION
86°/67°
Dew margin
9.5°F
Overnight dew
Low
Rain
3%
Window
8am–5pm

Hot afternoon (86°F, ceiling 86°F) — coat early and follow the shade.

MonRISK
91°/68°
Dew margin
0.3°F
Overnight dew
High
Rain
21%
Window

High condensation risk overnight — surface dips to within 0.3°F of the 68°F dew point (low 64°F, 100% cloud, 9 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

TueRISK
73°/66°
Dew margin
4.9°F
Overnight dew
Watch
Rain
45%
Window

Rain likely in the 24h cure window (45% chance, ~1.8mm) — it can wash out or mar an uncured coat.

WedGO
83°/65°
Dew margin
12.3°F
Overnight dew
Low
Rain
20%
Window
8am–5pm

Clear to coat: temps 65–83°F, RH under 76%, surface stays 12.3°F+ above the dew point, no rain in the cure window.

CautionThu — today & tonight
  • High humidity (86%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5086°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Bloomington

Epoxy & Resin Floors weather elsewhere in Minnesota