paint·day

Is it good to coat in Richmond, VA this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Richmond, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Tue (Caution)
TueCAUTION
90°/72°
Dew margin
3.1°F
Overnight dew
Watch
Rain
20%
Window
10am–5pm

Watch overnight dew — surface comes within 3.1°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

WedCAUTION
90°/74°
Dew margin
4.6°F
Overnight dew
Watch
Rain
11%
Window
9am–7pm

Watch overnight dew — surface comes within 4.6°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

ThuRISK
94°/73°
Dew margin
5.7°F
Overnight dew
Low
Rain
43%
Window

Too hot — high of 94°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

FriRISK
90°/73°
Dew margin
5.6°F
Overnight dew
Low
Rain
49%
Window

Rain likely in the 24h cure window (49% chance, ~2.6mm) — it can wash out or mar an uncured coat.

SatCAUTION
88°/71°
Dew margin
11.6°F
Overnight dew
Low
Rain
14%
Window
8am–5pm

Hot afternoon (88°F, ceiling 86°F) — coat early and follow the shade.

SunRISK
92°/72°
Dew margin
2.4°F
Overnight dew
Watch
Rain
21%
Window

Too hot — high of 92°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

MonRISK
98°/76°
Dew margin
20.6°F
Overnight dew
Low
Rain
41%
Window

Too hot — high of 98°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

CautionTue — today & tonight
  • Watch overnight dew — surface comes within 3.1°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
  • Hot afternoon (90°F, ceiling 86°F) — coat early and follow the shade.
  • High humidity (92%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5086°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Richmond

Epoxy & Resin Floors weather elsewhere in Virginia