Is it good to paint in Huntsville, AL this week?
A live 7-day go/no-go calendar for exterior paint in Huntsville, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- 6.9°F
- Overnight dew
- Low
- Rain
- 0%
- Window
- 8am–5pm
Hot afternoon (85°F, ceiling 85°F) — paint early and follow the shade.
- Dew margin
- 12.7°F
- Overnight dew
- Low
- Rain
- 0%
- Window
- 8am–5pm
Clear to paint: temps 62–85°F, RH under 48%, surface stays 12.7°F+ above the dew point, no rain in the cure window.
- Dew margin
- 0.7°F
- Overnight dew
- High
- Rain
- 0%
- Window
- —
High condensation risk overnight — surface dips to within 0.7°F of the 47°F dew point (low 47°F, 5% cloud, 5 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 1.5°F
- Overnight dew
- High
- Rain
- 0%
- Window
- —
High condensation risk overnight — surface dips to within 1.5°F of the 62°F dew point (low 63°F, 30% cloud, 5 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 0.6°F
- Overnight dew
- High
- Rain
- 15%
- Window
- —
High condensation risk overnight — surface dips to within 0.6°F of the 70°F dew point (low 70°F, 100% cloud, 3 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 0.3°F
- Overnight dew
- High
- Rain
- 44%
- Window
- —
High condensation risk overnight — surface dips to within 0.3°F of the 70°F dew point (low 67°F, 100% cloud, 3 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 3.1°F
- Overnight dew
- Watch
- Rain
- 43%
- Window
- —
Humidity peaks at 98% — well above the 85% ceiling; cure stalls and moisture gets trapped.
- Hot afternoon (85°F, ceiling 85°F) — paint early and follow the shade.
Caution. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Overnight dew condensing on a fresh coat causes blistering, surfactant leaching and peeling — the cause of 40%+ of exterior paint failures.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–85°F band (low-temp lines to 35°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.