paint·day

Is it good to paint in Las Vegas, NV this week?

A live 7-day go/no-go calendar for exterior paint in Las Vegas, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold off
SunRISK
96°/81°
Dew margin
48°F
Overnight dew
Low
Rain
1%
Window

Too hot — high of 96°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

MonRISK
96°/76°
Dew margin
37.2°F
Overnight dew
Low
Rain
1%
Window

Too hot — high of 96°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

TueRISK
93°/79°
Dew margin
40.7°F
Overnight dew
Low
Rain
0%
Window

Too hot — high of 93°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

WedRISK
97°/79°
Dew margin
44.8°F
Overnight dew
Low
Rain
0%
Window

Too hot — high of 97°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

ThuRISK
98°/83°
Dew margin
47.2°F
Overnight dew
Low
Rain
0%
Window

Too hot — high of 98°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

FriRISK
98°/83°
Dew margin
53.1°F
Overnight dew
Low
Rain
1%
Window

Too hot — high of 98°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

SatRISK
101°/85°
Dew margin
63.2°F
Overnight dew
Low
Rain
1%
Window

Too hot — high of 101°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

Hold offSun — today & tonight
  • Too hot — high of 96°F is well over the 85°F ceiling; the film skins over before it can level or adhere.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Overnight dew condensing on a fresh coat causes blistering, surfactant leaching and peeling — the cause of 40%+ of exterior paint failures.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5085°F band (low-temp lines to 35°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Las Vegas

Exterior Paint weather elsewhere in Nevada