paint·day

Is it good to stain in Birmingham, AL this week?

A live 7-day go/no-go calendar for deck & fence stain in Birmingham, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold off
SunRISK
93°/79°
Dew margin
-1.4°F
Overnight dew
High
Rain
2%
Window

High condensation risk overnight — surface dips to within -1.4°F of the 72°F dew point (low 71°F, 0% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

MonRISK
95°/80°
Dew margin
3.2°F
Overnight dew
High
Rain
1%
Window

High condensation risk overnight — surface dips to within 3.2°F of the 70°F dew point (low 73°F, 0% cloud, 2 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

TueRISK
97°/84°
Dew margin
7.5°F
Overnight dew
Low
Rain
19%
Window

Too hot — high of 97°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

WedRISK
97°/82°
Dew margin
5.8°F
Overnight dew
Low
Rain
22%
Window

Too hot — high of 97°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

ThuRISK
98°/74°
Dew margin
4.5°F
Overnight dew
High
Rain
18%
Window

High condensation risk overnight — surface dips to within 4.5°F of the 71°F dew point (low 75°F, 2% cloud, 2 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

FriRISK
96°/80°
Dew margin
7.4°F
Overnight dew
Low
Rain
19%
Window

Too hot — high of 96°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

SatRISK
99°/81°
Dew margin
2.8°F
Overnight dew
Watch
Rain
27%
Window

Too hot — high of 99°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

Hold offSun — today & tonight
  • High condensation risk overnight — surface dips to within -1.4°F of the 72°F dew point (low 71°F, 0% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
  • Hot afternoon (93°F, ceiling 90°F) — stain early and follow the shade.
  • High humidity (89%, over the 85% mark) slows drying — keep an eye on the cure window.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5090°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Birmingham

Deck & Fence Stain weather elsewhere in Alabama