paint·day

Is it good to stain in Washington, DC this week?

A live 7-day go/no-go calendar for deck & fence stain in Washington, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Tue (Caution)
ThuRISK
86°/61°
Dew margin
5.3°F
Overnight dew
Low
Rain
5%
Window
—

Humidity peaks at 96% — well above the 85% ceiling; cure stalls and moisture gets trapped.

FriRISK
92°/64°
Dew margin
3.8°F
Overnight dew
Watch
Rain
40%
Window
—

Rain likely in the 24h cure window (40% chance, ~1.3mm) — it can wash out or mar an uncured stain.

SatRISK
61°/56°
Dew margin
4.9°F
Overnight dew
Watch
Rain
37%
Window
—

Rain likely in the 24h cure window (37% chance, ~3.2mm) — it can wash out or mar an uncured stain.

SunRISK
62°/61°
Dew margin
-0.2°F
Overnight dew
High
Rain
56%
Window
—

High condensation risk overnight — surface dips to within -0.2°F of the 60°F dew point (low 60°F, 100% cloud, 3 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

MonRISK
74°/60°
Dew margin
16.3°F
Overnight dew
Low
Rain
5%
Window
—

Humidity peaks at 96% — well above the 85% ceiling; cure stalls and moisture gets trapped.

TueCAUTION
61°/48°
Dew margin
12.8°F
Overnight dew
Low
Rain
0%
Window
10am–5pm

Cold mornings (down to 48°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

WedCAUTION
66°/48°
Dew margin
8°F
Overnight dew
Low
Rain
1%
Window
9am–5pm

Cold mornings (down to 48°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

Hold offThu — today & tonight
  • Humidity peaks at 96% — well above the 85% ceiling; cure stalls and moisture gets trapped.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Washington