Is it good to stain in Billings, MT this week?
A live 7-day go/no-go calendar for deck & fence stain in Billings, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- 8.5°F
- Overnight dew
- Low
- Rain
- 5%
- Window
- 10am–5pm
Cold mornings (down to 49°F, floor is 50°F) — wait for the surface to warm past midday before you stain.
- Dew margin
- 13.7°F
- Overnight dew
- Low
- Rain
- 4%
- Window
- 9am–5pm
Cold mornings (down to 46°F, floor is 50°F) — wait for the surface to warm past midday before you stain.
- Dew margin
- 8.8°F
- Overnight dew
- Low
- Rain
- 0%
- Window
- 8am–5pm
Clear to stain: temps 51–71°F, RH under 59%, surface stays 8.8°F+ above the dew point, no rain in the cure window.
- Dew margin
- 12.3°F
- Overnight dew
- Low
- Rain
- 0%
- Window
- 8am–5pm
Clear to stain: temps 52–78°F, RH under 56%, surface stays 12.3°F+ above the dew point, no rain in the cure window.
- Dew margin
- 21.4°F
- Overnight dew
- Low
- Rain
- 1%
- Window
- 8am–5pm
Clear to stain: temps 58–88°F, RH under 35%, surface stays 21.4°F+ above the dew point, no rain in the cure window.
- Dew margin
- 15.6°F
- Overnight dew
- Low
- Rain
- 1%
- Window
- 8am–5pm
Clear to stain: temps 63–80°F, RH under 32%, surface stays 15.6°F+ above the dew point, no rain in the cure window.
- Dew margin
- 25.3°F
- Overnight dew
- Low
- Rain
- 0%
- Window
- 8am–5pm
Clear to stain: temps 59–82°F, RH under 32%, surface stays 25.3°F+ above the dew point, no rain in the cure window.
- Cold mornings (down to 49°F, floor is 50°F) — wait for the surface to warm past midday before you stain.
- High humidity (88%, over the 85% mark) slows drying — keep an eye on the cure window.
Caution. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–90°F band (low-temp lines to 45°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.