paint·day

Is it good to stain in Newark, NJ this week?

A live 7-day go/no-go calendar for deck & fence stain in Newark, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Sun (Good to go)
WedRISK
78°/60°
Dew margin
1.4°F
Overnight dew
High
Rain
6%
Window
—

High condensation risk overnight — surface dips to within 1.4°F of the 62°F dew point (low 62°F, 100% cloud, 6 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

ThuRISK
74°/64°
Dew margin
1.9°F
Overnight dew
High
Rain
4%
Window
—

High condensation risk overnight — surface dips to within 1.9°F of the 64°F dew point (low 62°F, 2% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

FriCAUTION
84°/64°
Dew margin
9.5°F
Overnight dew
Low
Rain
35%
Window
9am–5pm

High humidity (89%, over the 85% mark) slows drying — keep an eye on the cure window.

SatRISK
73°/61°
Dew margin
4.4°F
Overnight dew
High
Rain
7%
Window
—

High condensation risk overnight — surface dips to within 4.4°F of the 52°F dew point (low 57°F, 0% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

SunGO
67°/60°
Dew margin
5.3°F
Overnight dew
Low
Rain
24%
Window
8am–5pm

Clear to stain: temps 60–67°F, RH under 65%, surface stays 5.3°F+ above the dew point, no rain in the cure window.

MonGO
73°/63°
Dew margin
14.5°F
Overnight dew
Low
Rain
22%
Window
8am–5pm

Clear to stain: temps 63–73°F, RH under 71%, surface stays 14.5°F+ above the dew point, no rain in the cure window.

TueCAUTION
59°/47°
Dew margin
20.6°F
Overnight dew
Low
Rain
1%
Window
10am–5pm

Cold mornings (down to 47°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

Hold offWed — today & tonight
  • High condensation risk overnight — surface dips to within 1.4°F of the 62°F dew point (low 62°F, 100% cloud, 6 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
  • High humidity (87%, over the 85% mark) slows drying — keep an eye on the cure window.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Newark

Deck & Fence Stain weather elsewhere in New Jersey