paint·day

Is it good to stain in Harrisburg, PA this week?

A live 7-day go/no-go calendar for deck & fence stain in Harrisburg, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Thu (Caution)
ThuCAUTION
79°/63°
Dew margin
5.9°F
Overnight dew
Low
Rain
4%
Window
12pm–5pm

High humidity (94%, over the 85% mark) slows drying — keep an eye on the cure window.

FriCAUTION
84°/63°
Dew margin
5°F
Overnight dew
Low
Rain
34%
Window
8am–5pm

Some rain risk (34%) during the cure window — re-check the radar before you start.

SatRISK
69°/52°
Dew margin
2°F
Overnight dew
High
Rain
14%
Window
—

High condensation risk overnight — surface dips to within 2°F of the 49°F dew point (low 51°F, 6% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

SunRISK
59°/55°
Dew margin
0.8°F
Overnight dew
High
Rain
37%
Window
—

High condensation risk overnight — surface dips to within 0.8°F of the 53°F dew point (low 53°F, 5% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

MonCAUTION
69°/54°
Dew margin
11.5°F
Overnight dew
Low
Rain
2%
Window
10am–5pm

High humidity (95%, over the 85% mark) slows drying — keep an eye on the cure window.

TueCAUTION
61°/41°
Dew margin
12°F
Overnight dew
Low
Rain
0%
Window
11am–5pm

Cold mornings (down to 41°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

WedCAUTION
67°/42°
Dew margin
12.9°F
Overnight dew
Low
Rain
0%
Window
10am–5pm

Cold mornings (down to 42°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

CautionThu — today & tonight
  • High humidity (94%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Harrisburg

Deck & Fence Stain weather elsewhere in Pennsylvania