paint·day

Is it good to stain in Rapid City, SD this week?

A live 7-day go/no-go calendar for deck & fence stain in Rapid City, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Mon (Good to go)
SunCAUTION
89°/73°
Dew margin
4.3°F
Overnight dew
Watch
Rain
41%
Window
8am–5pm

Watch overnight dew — surface comes within 4.3°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

MonGO
82°/67°
Dew margin
8.2°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to stain: temps 67–82°F, RH under 31%, surface stays 8.2°F+ above the dew point, no rain in the cure window.

TueCAUTION
93°/65°
Dew margin
6.8°F
Overnight dew
Low
Rain
19%
Window
8am–5pm

Hot afternoon (93°F, ceiling 90°F) — stain early and follow the shade.

WedGO
86°/66°
Dew margin
12.2°F
Overnight dew
Low
Rain
27%
Window
8am–5pm

Clear to stain: temps 66–86°F, RH under 60%, surface stays 12.2°F+ above the dew point, no rain in the cure window.

ThuRISK
93°/65°
Dew margin
4.6°F
Overnight dew
Watch
Rain
32%
Window

Rain likely in the 24h cure window (32% chance, ~1.1mm) — it can wash out or mar an uncured stain.

FriRISK
98°/72°
Dew margin
11.2°F
Overnight dew
Low
Rain
24%
Window

Too hot — high of 98°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

SatGO
87°/75°
Dew margin
26.7°F
Overnight dew
Low
Rain
29%
Window
8am–5pm

Clear to stain: temps 75–87°F, RH under 38%, surface stays 26.7°F+ above the dew point, no rain in the cure window.

CautionSun — today & tonight
  • Watch overnight dew — surface comes within 4.3°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
  • Some rain risk (41%) during the cure window — re-check the radar before you start.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5090°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Rapid City

Deck & Fence Stain weather elsewhere in South Dakota