paint·day

Is it good to coat in Gilbert, AZ this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Gilbert, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Wed (Caution)
SunRISK
98°/81°
Dew margin
11.3°F
Overnight dew
Low
Rain
15%
Window
—

Too hot — high of 98°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

MonRISK
80°/74°
Dew margin
8.7°F
Overnight dew
Low
Rain
82%
Window
—

Rain likely in the 24h cure window (82% chance, ~5.6mm) — it can wash out or mar an uncured coat.

TueRISK
86°/73°
Dew margin
20°F
Overnight dew
Low
Rain
75%
Window
—

Rain likely in the 24h cure window (75% chance) — it can wash out or mar an uncured coat.

WedCAUTION
89°/77°
Dew margin
20°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Hot afternoon (89°F, ceiling 86°F) — coat early and follow the shade.

ThuRISK
95°/82°
Dew margin
20°F
Overnight dew
Low
Rain
0%
Window
—

Too hot — high of 95°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

FriRISK
95°/83°
Dew margin
18°F
Overnight dew
Low
Rain
0%
Window
—

Too hot — high of 95°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

SatRISK
93°/78°
Dew margin
28.5°F
Overnight dew
Low
Rain
0%
Window
—

Too hot — high of 93°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

Hold offSun — today & tonight
  • Too hot — high of 98°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–86°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Gilbert

Epoxy & Resin Floors weather elsewhere in Arizona