paint·day

Is it good to coat in West Valley City, UT this week?

A live 7-day go/no-go calendar for epoxy & resin floors in West Valley City, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayGood to goBest upcoming window: Sun (Good to go)
SunGO
68°/57°
Dew margin
20.8°F
Overnight dew
Low
Rain
21%
Window
8am–5pm

Clear to coat: temps 57–68°F, RH under 52%, surface stays 20.8°F+ above the dew point, no rain in the cure window.

MonGO
74°/56°
Dew margin
23.5°F
Overnight dew
Low
Rain
3%
Window
8am–5pm

Clear to coat: temps 56–74°F, RH under 37%, surface stays 23.5°F+ above the dew point, no rain in the cure window.

TueGO
82°/63°
Dew margin
28.8°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to coat: temps 63–82°F, RH under 31%, surface stays 28.8°F+ above the dew point, no rain in the cure window.

WedGO
85°/70°
Dew margin
25.5°F
Overnight dew
Low
Rain
3%
Window
8am–5pm

Clear to coat: temps 70–85°F, RH under 20%, surface stays 25.5°F+ above the dew point, no rain in the cure window.

ThuCAUTION
90°/71°
Dew margin
40.8°F
Overnight dew
Low
Rain
1%
Window
8am–5pm

Hot afternoon (90°F, ceiling 86°F) — coat early and follow the shade.

FriCAUTION
89°/74°
Dew margin
15.6°F
Overnight dew
Low
Rain
1%
Window
8am–5pm

Hot afternoon (89°F, ceiling 86°F) — coat early and follow the shade.

SatCAUTION
90°/68°
Dew margin
35.3°F
Overnight dew
Low
Rain
0%
Window
8am–5pm

Hot afternoon (90°F, ceiling 86°F) — coat early and follow the shade.

Good to goSun — today & tonight
  • Clear to coat: temps 57–68°F, RH under 52%, surface stays 20.8°F+ above the dew point, no rain in the cure window.

Good to go. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5086°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in West Valley City

Epoxy & Resin Floors weather elsewhere in Utah