Is it good to paint in Bozeman, MT this week?
A live 7-day go/no-go calendar for exterior paint in Bozeman, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- 9.2°F
- Overnight dew
- Low
- Rain
- 2%
- Window
- 1pm–5pm
Cold mornings (down to 33°F, floor is 50°F) — wait for the surface to warm past midday before you paint.
- Dew margin
- -2.8°F
- Overnight dew
- High
- Rain
- 95%
- Window
- —
High condensation risk overnight — surface dips to within -2.8°F of the 37°F dew point (low 29°F, 100% cloud, 9 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 3.6°F
- Overnight dew
- Watch
- Rain
- 32%
- Window
- —
Too cold to paint — daytime high only 36°F, below the 50°F minimum (even a low-temp line needs 35°F+).
- Dew margin
- 2.6°F
- Overnight dew
- Watch
- Rain
- 19%
- Window
- —
Too cold to paint — daytime high only 36°F, below the 50°F minimum (even a low-temp line needs 35°F+).
- Dew margin
- 2.3°F
- Overnight dew
- Watch
- Rain
- 34%
- Window
- —
Too cold to paint — daytime high only 33°F, below the 50°F minimum (even a low-temp line needs 35°F+).
- Dew margin
- 3.3°F
- Overnight dew
- Watch
- Rain
- 18%
- Window
- —
Too cold to paint — daytime high only 35°F, below the 50°F minimum (even a low-temp line needs 35°F+).
- Dew margin
- 0.2°F
- Overnight dew
- High
- Rain
- 14%
- Window
- —
High condensation risk overnight — surface dips to within 0.2°F of the 27°F dew point (low 24°F, 100% cloud, 4 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Cold mornings (down to 33°F, floor is 50°F) — wait for the surface to warm past midday before you paint.
Caution. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Overnight dew condensing on a fresh coat causes blistering, surfactant leaching and peeling — the cause of 40%+ of exterior paint failures.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–85°F band (low-temp lines to 35°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.