Is it good to paint in Erie, PA this week?

A live 7-day go/no-go calendar for exterior paint in Erie, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Sat (Good to go)
WedCAUTION
76°/59°
Dew margin
5.3°F
Overnight dew
Low
Rain
47%
Window
8am–5pm

Some rain risk (47%) during the cure window — re-check the radar before you start.

ThuRISK
82°/66°
Dew margin
0.9°F
Overnight dew
High
Rain
82%
Window
—

High condensation risk overnight — surface dips to within 0.9°F of the 62°F dew point (low 62°F, 100% cloud, 12 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.

FriRISK
65°/61°
Dew margin
6°F
Overnight dew
Low
Rain
82%
Window
—

Humidity peaks at 98% — well above the 85% ceiling; cure stalls and moisture gets trapped.

SatGO
63°/51°
Dew margin
8.6°F
Overnight dew
Low
Rain
0%
Window
8am–5pm

Clear to paint: temps 51–63°F, RH under 80%, surface stays 8.6°F+ above the dew point, no rain in the cure window.

SunCAUTION
69°/51°
Dew margin
2.4°F
Overnight dew
Watch
Rain
5%
Window
8am–5pm

Watch overnight dew — surface comes within 2.4°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

MonGO
56°/52°
Dew margin
6.3°F
Overnight dew
Low
Rain
6%
Window
8am–5pm

Clear to paint: temps 52–56°F, RH under 66%, surface stays 6.3°F+ above the dew point, no rain in the cure window.

TueCAUTION
53°/48°
Dew margin
11.8°F
Overnight dew
Low
Rain
0%
Window
10am–5pm

Cold mornings (down to 48°F, floor is 50°F) — wait for the surface to warm past midday before you paint.

CautionWed — today & tonight
  • Some rain risk (47%) during the cure window — re-check the radar before you start.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Overnight dew condensing on a fresh coat causes blistering, surfactant leaching and peeling — the cause of 40%+ of exterior paint failures.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–85°F band (low-temp lines to 35°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→