paint·day

Is it good to coat in Erie, PA this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Erie, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Sat (Good to go)
WedRISK
76°/58°
Dew margin
4.9°F
Overnight dew
Watch
Rain
62%
Window
—

Rain likely in the 24h cure window (62% chance, ~1.2mm) — it can wash out or mar an uncured coat.

ThuRISK
77°/65°
Dew margin
2.1°F
Overnight dew
Watch
Rain
79%
Window
—

Rain likely in the 24h cure window (79% chance) — it can wash out or mar an uncured coat.

FriRISK
68°/59°
Dew margin
6.3°F
Overnight dew
Low
Rain
81%
Window
—

Humidity peaks at 97% — well above the 85% ceiling; cure stalls and moisture gets trapped.

SatGO
62°/52°
Dew margin
9.3°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to coat: temps 52–62°F, RH under 79%, surface stays 9.3°F+ above the dew point, no rain in the cure window.

SunCAUTION
66°/50°
Dew margin
6.1°F
Overnight dew
Low
Rain
18%
Window
9am–5pm

Cold mornings (down to 50°F, floor is 50°F) — wait for the surface to warm past midday before you coat.

MonGO
54°/50°
Dew margin
7.2°F
Overnight dew
Low
Rain
7%
Window
8am–5pm

Clear to coat: temps 50–54°F, RH under 61%, surface stays 7.2°F+ above the dew point, no rain in the cure window.

TueCAUTION
52°/45°
Dew margin
12.3°F
Overnight dew
Low
Rain
1%
Window
12pm–5pm

Cold mornings (down to 45°F, floor is 50°F) — wait for the surface to warm past midday before you coat.

Hold offWed — today & tonight
  • Rain likely in the 24h cure window (62% chance, ~1.2mm) — it can wash out or mar an uncured coat.
  • Watch overnight dew — surface comes within 4.9°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–86°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Erie

Epoxy & Resin Floors weather elsewhere in Pennsylvania