Is it good to paint in Knoxville, TN this week?
A live 7-day go/no-go calendar for exterior paint in Knoxville, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- -0.8°F
- Overnight dew
- High
- Rain
- 72%
- Window
- —
High condensation risk overnight — surface dips to within -0.8°F of the 73°F dew point (low 72°F, 84% cloud, 2 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- -0.7°F
- Overnight dew
- High
- Rain
- 16%
- Window
- —
High condensation risk overnight — surface dips to within -0.7°F of the 75°F dew point (low 71°F, 100% cloud, 4 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 1.2°F
- Overnight dew
- High
- Rain
- 2%
- Window
- —
High condensation risk overnight — surface dips to within 1.2°F of the 69°F dew point (low 71°F, 0% cloud, 2 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 0.6°F
- Overnight dew
- High
- Rain
- 5%
- Window
- —
High condensation risk overnight — surface dips to within 0.6°F of the 68°F dew point (low 66°F, 100% cloud, 6 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 0.6°F
- Overnight dew
- High
- Rain
- 22%
- Window
- —
High condensation risk overnight — surface dips to within 0.6°F of the 66°F dew point (low 66°F, 0% cloud, 3 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 3°F
- Overnight dew
- High
- Rain
- 22%
- Window
- —
High condensation risk overnight — surface dips to within 3°F of the 67°F dew point (low 69°F, 32% cloud, 4 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Dew margin
- 4.7°F
- Overnight dew
- Watch
- Rain
- 26%
- Window
- —
Too hot — high of 97°F is well over the 85°F ceiling; the film skins over before it can level or adhere.
- High condensation risk overnight — surface dips to within -0.8°F of the 73°F dew point (low 72°F, 84% cloud, 2 mph wind). A fresh paint can blush/blister. Stop 4h before dew falls.
- Humidity peaks at 100% — well above the 85% ceiling; cure stalls and moisture gets trapped.
- Rain likely in the 24h cure window (72% chance, ~19.3mm) — it can wash out or mar an uncured paint.
Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Overnight dew condensing on a fresh coat causes blistering, surfactant leaching and peeling — the cause of 40%+ of exterior paint failures.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–85°F band (low-temp lines to 35°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.