paint·day

Is it good to stain in Aurora, CO this week?

A live 7-day go/no-go calendar for deck & fence stain in Aurora, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Tue (Caution)
MonRISK
66°/38°
Dew margin
-0.1°F
Overnight dew
High
Rain
0%
Window
—

High condensation risk overnight — surface dips to within -0.1°F of the 28°F dew point (low 28°F, 100% cloud, 6 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

TueCAUTION
68°/39°
Dew margin
7.6°F
Overnight dew
Low
Rain
0%
Window
10am–5pm

Cold mornings (down to 39°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

WedCAUTION
57°/43°
Dew margin
19.3°F
Overnight dew
Low
Rain
0%
Window
10am–5pm

Cold mornings (down to 43°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

ThuCAUTION
55°/41°
Dew margin
18.6°F
Overnight dew
Low
Rain
0%
Window
12pm–5pm

Cold mornings (down to 41°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

FriCAUTION
63°/43°
Dew margin
6.8°F
Overnight dew
Low
Rain
14%
Window
11am–5pm

Cold mornings (down to 43°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

SatCAUTION
51°/41°
Dew margin
11.9°F
Overnight dew
Low
Rain
8%
Window
1pm–5pm

Cold mornings (down to 41°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

SunCAUTION
51°/37°
Dew margin
30.1°F
Overnight dew
Low
Rain
2%
Window
2pm–5pm

Cold mornings (down to 37°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

Hold offMon — today & tonight
  • High condensation risk overnight — surface dips to within -0.1°F of the 28°F dew point (low 28°F, 100% cloud, 6 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
  • Cold mornings (down to 38°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Aurora

Deck & Fence Stain weather elsewhere in Colorado