paint·day

Is it good to stain in Boise, ID this week?

A live 7-day go/no-go calendar for deck & fence stain in Boise, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Fri (Good to go)
TueRISK
96°/62°
Dew margin
21.6°F
Overnight dew
Low
Rain
0%
Window

Too hot — high of 96°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

WedCAUTION
92°/62°
Dew margin
21.7°F
Overnight dew
Low
Rain
1%
Window
8am–5pm

Hot afternoon (92°F, ceiling 90°F) — stain early and follow the shade.

ThuCAUTION
91°/64°
Dew margin
12.8°F
Overnight dew
Low
Rain
27%
Window
8am–5pm

Hot afternoon (91°F, ceiling 90°F) — stain early and follow the shade.

FriGO
87°/72°
Dew margin
17.3°F
Overnight dew
Low
Rain
27%
Window
8am–5pm

Clear to stain: temps 72–87°F, RH under 51%, surface stays 17.3°F+ above the dew point, no rain in the cure window.

SatRISK
96°/72°
Dew margin
19.1°F
Overnight dew
Low
Rain
12%
Window

Too hot — high of 96°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

SunRISK
97°/74°
Dew margin
30.6°F
Overnight dew
Low
Rain
5%
Window

Too hot — high of 97°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

MonRISK
100°/79°
Dew margin
36.3°F
Overnight dew
Low
Rain
6%
Window

Too hot — high of 100°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

Hold offTue — today & tonight
  • Too hot — high of 96°F is well over the 90°F ceiling; the film skins over before it can level or adhere.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5090°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Boise

Deck & Fence Stain weather elsewhere in Idaho