paint·day

Is it good to coat in Boise, ID this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Boise, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Mon (Good to go)
SunCAUTION
65°/50°
Dew margin
10.2°F
Overnight dew
Low
Rain
20%
Window
9am–5pm

Cold mornings (down to 50°F, floor is 50°F) — wait for the surface to warm past midday before you coat.

MonGO
71°/56°
Dew margin
7.7°F
Overnight dew
Low
Rain
6%
Window
8am–5pm

Clear to coat: temps 56–71°F, RH under 59%, surface stays 7.7°F+ above the dew point, no rain in the cure window.

TueGO
81°/60°
Dew margin
10.9°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to coat: temps 60–81°F, RH under 54%, surface stays 10.9°F+ above the dew point, no rain in the cure window.

WedGO
84°/64°
Dew margin
21.5°F
Overnight dew
Low
Rain
4%
Window
8am–5pm

Clear to coat: temps 64–84°F, RH under 48%, surface stays 21.5°F+ above the dew point, no rain in the cure window.

ThuGO
82°/67°
Dew margin
19°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to coat: temps 67–82°F, RH under 27%, surface stays 19°F+ above the dew point, no rain in the cure window.

FriGO
84°/65°
Dew margin
22.9°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to coat: temps 65–84°F, RH under 42%, surface stays 22.9°F+ above the dew point, no rain in the cure window.

SatRISK
93°/70°
Dew margin
33.6°F
Overnight dew
Low
Rain
0%
Window

Too hot — high of 93°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

CautionSun — today & tonight
  • Cold mornings (down to 50°F, floor is 50°F) — wait for the surface to warm past midday before you coat.
  • High humidity (86%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5086°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Boise

Epoxy & Resin Floors weather elsewhere in Idaho