Is it good to stain in Detroit, MI this week?
A live 7-day go/no-go calendar for deck & fence stain in Detroit, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- 1.8°F
- Overnight dew
- High
- Rain
- 0%
- Window
- —
High condensation risk overnight — surface dips to within 1.8°F of the 30°F dew point (low 31°F, 14% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 1.5°F
- Overnight dew
- High
- Rain
- 0%
- Window
- —
High condensation risk overnight — surface dips to within 1.5°F of the 32°F dew point (low 33°F, 96% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 7.7°F
- Overnight dew
- Low
- Rain
- 0%
- Window
- 12pm–5pm
Cold mornings (down to 33°F, floor is 50°F) — wait for the surface to warm past midday before you stain.
- Dew margin
- 4.4°F
- Overnight dew
- High
- Rain
- 0%
- Window
- —
High condensation risk overnight — surface dips to within 4.4°F of the 39°F dew point (low 43°F, 5% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 4.3°F
- Overnight dew
- High
- Rain
- 1%
- Window
- —
High condensation risk overnight — surface dips to within 4.3°F of the 43°F dew point (low 43°F, 6% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- -2.7°F
- Overnight dew
- High
- Rain
- 23%
- Window
- —
High condensation risk overnight — surface dips to within -2.7°F of the 49°F dew point (low 46°F, 100% cloud, 8 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- -5.4°F
- Overnight dew
- High
- Rain
- 27%
- Window
- —
High condensation risk overnight — surface dips to within -5.4°F of the 51°F dew point (low 39°F, 100% cloud, 8 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- High condensation risk overnight — surface dips to within 1.8°F of the 30°F dew point (low 31°F, 14% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Too cold to stain — daytime high only 47°F, below the 50°F minimum (even a low-temp line needs 45°F+).
Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–90°F band (low-temp lines to 45°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.