Is it good to stain in Broken Arrow, OK this week?
A live 7-day go/no-go calendar for deck & fence stain in Broken Arrow, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- 1.1°F
- Overnight dew
- High
- Rain
- 59%
- Window
- —
High condensation risk overnight — surface dips to within 1.1°F of the 70°F dew point (low 71°F, 100% cloud, 3 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 0.8°F
- Overnight dew
- High
- Rain
- 69%
- Window
- —
High condensation risk overnight — surface dips to within 0.8°F of the 64°F dew point (low 65°F, 54% cloud, 6 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- -1.4°F
- Overnight dew
- High
- Rain
- 24%
- Window
- —
High condensation risk overnight — surface dips to within -1.4°F of the 66°F dew point (low 64°F, 100% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- -3.3°F
- Overnight dew
- High
- Rain
- 16%
- Window
- —
High condensation risk overnight — surface dips to within -3.3°F of the 65°F dew point (low 61°F, 100% cloud, 7 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- -0.8°F
- Overnight dew
- High
- Rain
- 4%
- Window
- —
High condensation risk overnight — surface dips to within -0.8°F of the 59°F dew point (low 57°F, 0% cloud, 9 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 10.5°F
- Overnight dew
- Low
- Rain
- 1%
- Window
- 9am–5pm
Clear to stain: temps 62–78°F, RH under 83%, surface stays 10.5°F+ above the dew point, no rain in the cure window.
- Dew margin
- 14.8°F
- Overnight dew
- Low
- Rain
- 1%
- Window
- 8am–5pm
Clear to stain: temps 58–78°F, RH under 51%, surface stays 14.8°F+ above the dew point, no rain in the cure window.
- High condensation risk overnight — surface dips to within 1.1°F of the 70°F dew point (low 71°F, 100% cloud, 3 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Rain likely in the 24h cure window (59% chance, ~4.3mm) — it can wash out or mar an uncured stain.
Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–90°F band (low-temp lines to 45°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.