paint·day

Is it good to stain in St. George, UT this week?

A live 7-day go/no-go calendar for deck & fence stain in St. George, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Wed (Caution)
MonRISK
67°/46°
Dew margin
2.3°F
Overnight dew
Watch
Rain
76%
Window
—

Rain likely in the 24h cure window (76% chance) — it can wash out or mar an uncured stain.

TueRISK
53°/49°
Dew margin
5.8°F
Overnight dew
Low
Rain
91%
Window
—

Rain likely in the 24h cure window (91% chance, ~4.7mm) — it can wash out or mar an uncured stain.

WedCAUTION
58°/38°
Dew margin
10.7°F
Overnight dew
Low
Rain
8%
Window
11am–5pm

Cold mornings (down to 38°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

ThuRISK
63°/49°
Dew margin
3.4°F
Overnight dew
Watch
Rain
87%
Window
—

Rain likely in the 24h cure window (87% chance, ~1.1mm) — it can wash out or mar an uncured stain.

FriCAUTION
56°/48°
Dew margin
5°F
Overnight dew
Low
Rain
39%
Window
9am–5pm

Cold mornings (down to 48°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

SatCAUTION
54°/43°
Dew margin
5.8°F
Overnight dew
Low
Rain
1%
Window
12pm–5pm

Cold mornings (down to 43°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

SunCAUTION
60°/46°
Dew margin
7°F
Overnight dew
Low
Rain
7%
Window
11am–5pm

Cold mornings (down to 46°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

Hold offMon — today & tonight
  • Rain likely in the 24h cure window (76% chance) — it can wash out or mar an uncured stain.
  • Watch overnight dew — surface comes within 2.3°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
  • Cold mornings (down to 46°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in St. George

Deck & Fence Stain weather elsewhere in Utah