Is it good to stain in Cheyenne, WY this week?
A live 7-day go/no-go calendar for deck & fence stain in Cheyenne, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- 21.4°F
- Overnight dew
- Low
- Rain
- 4%
- Window
- 8am–5pm
Clear to stain: temps 60–84°F, RH under 48%, surface stays 21.4°F+ above the dew point, no rain in the cure window.
- Dew margin
- 28.7°F
- Overnight dew
- Low
- Rain
- 1%
- Window
- 8am–5pm
Clear to stain: temps 62–76°F, RH under 27%, surface stays 28.7°F+ above the dew point, no rain in the cure window.
- Dew margin
- 17.7°F
- Overnight dew
- Low
- Rain
- 28%
- Window
- 8am–5pm
Clear to stain: temps 66–84°F, RH under 19%, surface stays 17.7°F+ above the dew point, no rain in the cure window.
- Dew margin
- 6.5°F
- Overnight dew
- Low
- Rain
- 16%
- Window
- —
Rain likely in the 24h cure window (16% chance, ~1.7mm) — it can wash out or mar an uncured stain.
- Dew margin
- 22.2°F
- Overnight dew
- Low
- Rain
- 10%
- Window
- 8am–5pm
Clear to stain: temps 71–86°F, RH under 19%, surface stays 22.2°F+ above the dew point, no rain in the cure window.
- Dew margin
- 18.5°F
- Overnight dew
- Low
- Rain
- 8%
- Window
- 8am–5pm
Hot afternoon (91°F, ceiling 90°F) — stain early and follow the shade.
- Dew margin
- 36.5°F
- Overnight dew
- Low
- Rain
- 13%
- Window
- 8am–5pm
Hot afternoon (90°F, ceiling 90°F) — stain early and follow the shade.
- Clear to stain: temps 60–84°F, RH under 48%, surface stays 21.4°F+ above the dew point, no rain in the cure window.
Good to go. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–90°F band (low-temp lines to 45°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.