paint·day

Is it good to coat in Boulder, CO this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Boulder, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayGood to goBest upcoming window: Wed (Good to go)
WedGO
68°/57°
Dew margin
15.7°F
Overnight dew
Low
Rain
8%
Window
8am–5pm

Clear to coat: temps 57–68°F, RH under 64%, surface stays 15.7°F+ above the dew point, no rain in the cure window.

ThuRISK
68°/58°
Dew margin
2°F
Overnight dew
High
Rain
11%
Window
—

High condensation risk overnight — surface dips to within 2°F of the 45°F dew point (low 44°F, 13% cloud, 2 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

FriCAUTION
83°/47°
Dew margin
18.3°F
Overnight dew
Low
Rain
0%
Window
10am–5pm

Cold mornings (down to 47°F, floor is 50°F) — wait for the surface to warm past midday before you coat.

SatGO
85°/65°
Dew margin
7.2°F
Overnight dew
Low
Rain
3%
Window
8am–5pm

Clear to coat: temps 65–85°F, RH under 31%, surface stays 7.2°F+ above the dew point, no rain in the cure window.

SunGO
78°/55°
Dew margin
25.5°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to coat: temps 55–78°F, RH under 61%, surface stays 25.5°F+ above the dew point, no rain in the cure window.

MonCAUTION
87°/63°
Dew margin
21.6°F
Overnight dew
Low
Rain
6%
Window
8am–5pm

Hot afternoon (87°F, ceiling 86°F) — coat early and follow the shade.

TueGO
84°/68°
Dew margin
20°F
Overnight dew
Low
Rain
10%
Window
8am–5pm

Clear to coat: temps 68–84°F, RH under 35%, surface stays 20°F+ above the dew point, no rain in the cure window.

Good to goWed — today & tonight
  • Clear to coat: temps 57–68°F, RH under 64%, surface stays 15.7°F+ above the dew point, no rain in the cure window.

Good to go. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–86°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Boulder

Epoxy & Resin Floors weather elsewhere in Colorado