Is it good to stain in Fort Lauderdale, FL this week?
A live 7-day go/no-go calendar for deck & fence stain in Fort Lauderdale, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- 6.1°F
- Overnight dew
- Low
- Rain
- 28%
- Window
- 8am–5pm
Clear to stain: temps 71–81°F, RH under 68%, surface stays 6.1°F+ above the dew point, no rain in the cure window.
- Dew margin
- 6.6°F
- Overnight dew
- Low
- Rain
- 46%
- Window
- 8am–5pm
Some rain risk (46%) during the cure window — re-check the radar before you start.
- Dew margin
- 4.5°F
- Overnight dew
- Watch
- Rain
- 65%
- Window
- —
Rain likely in the 24h cure window (65% chance, ~15.7mm) — it can wash out or mar an uncured stain.
- Dew margin
- 4.5°F
- Overnight dew
- Watch
- Rain
- 63%
- Window
- —
Rain likely in the 24h cure window (63% chance, ~14.3mm) — it can wash out or mar an uncured stain.
- Dew margin
- 2.1°F
- Overnight dew
- Watch
- Rain
- 59%
- Window
- —
Rain likely in the 24h cure window (59% chance, ~31mm) — it can wash out or mar an uncured stain.
- Dew margin
- 2.8°F
- Overnight dew
- Watch
- Rain
- 31%
- Window
- 8am–7pm
Watch overnight dew — surface comes within 2.8°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
- Dew margin
- 4.9°F
- Overnight dew
- Watch
- Rain
- 23%
- Window
- 8am–7pm
Watch overnight dew — surface comes within 4.9°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
- Clear to stain: temps 71–81°F, RH under 68%, surface stays 6.1°F+ above the dew point, no rain in the cure window.
Good to go. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–90°F band (low-temp lines to 45°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.