paint·day

Is it good to stain in Shreveport, LA this week?

A live 7-day go/no-go calendar for deck & fence stain in Shreveport, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Sun (Good to go)
TueRISK
67°/42°
Dew margin
1.9°F
Overnight dew
High
Rain
0%
Window
—

High condensation risk overnight — surface dips to within 1.9°F of the 44°F dew point (low 46°F, 38% cloud, 3 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

WedRISK
70°/51°
Dew margin
-0.9°F
Overnight dew
High
Rain
0%
Window
—

High condensation risk overnight — surface dips to within -0.9°F of the 51°F dew point (low 51°F, 100% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

ThuRISK
72°/62°
Dew margin
1°F
Overnight dew
High
Rain
1%
Window
—

High condensation risk overnight — surface dips to within 1°F of the 56°F dew point (low 57°F, 100% cloud, 3 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

FriCAUTION
74°/61°
Dew margin
2.4°F
Overnight dew
Watch
Rain
0%
Window
8am–5pm

Watch overnight dew — surface comes within 2.4°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

SatCAUTION
74°/66°
Dew margin
4.8°F
Overnight dew
Watch
Rain
11%
Window
8am–5pm

Watch overnight dew — surface comes within 4.8°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

SunGO
78°/63°
Dew margin
6.7°F
Overnight dew
Low
Rain
11%
Window
8am–5pm

Clear to stain: temps 63–78°F, RH under 79%, surface stays 6.7°F+ above the dew point, no rain in the cure window.

MonGO
74°/59°
Dew margin
11.7°F
Overnight dew
Low
Rain
2%
Window
8am–5pm

Clear to stain: temps 59–74°F, RH under 44%, surface stays 11.7°F+ above the dew point, no rain in the cure window.

Hold offTue — today & tonight
  • High condensation risk overnight — surface dips to within 1.9°F of the 44°F dew point (low 46°F, 38% cloud, 3 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
  • Cold mornings (down to 42°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Shreveport

Deck & Fence Stain weather elsewhere in Louisiana