Is it good to stain in Charlotte, NC this week?
A live 7-day go/no-go calendar for deck & fence stain in Charlotte, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.
- Dew margin
- -1.5°F
- Overnight dew
- High
- Rain
- 0%
- Window
- —
High condensation risk overnight — surface dips to within -1.5°F of the 27°F dew point (low 26°F, 4% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 2.2°F
- Overnight dew
- High
- Rain
- 0%
- Window
- —
High condensation risk overnight — surface dips to within 2.2°F of the 28°F dew point (low 30°F, 0% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- -6.9°F
- Overnight dew
- High
- Rain
- 3%
- Window
- —
High condensation risk overnight — surface dips to within -6.9°F of the 42°F dew point (low 35°F, 20% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 2.9°F
- Overnight dew
- Watch
- Rain
- 9%
- Window
- 9am–4pm
Watch overnight dew — surface comes within 2.9°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
- Dew margin
- 1.3°F
- Overnight dew
- High
- Rain
- 21%
- Window
- —
High condensation risk overnight — surface dips to within 1.3°F of the 50°F dew point (low 52°F, 100% cloud, 10 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- -7.2°F
- Overnight dew
- High
- Rain
- 13%
- Window
- —
High condensation risk overnight — surface dips to within -7.2°F of the 47°F dew point (low 40°F, 4% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Dew margin
- 13.8°F
- Overnight dew
- Low
- Rain
- 3%
- Window
- 9am–5pm
Clear to stain: temps 54–68°F, RH under 71%, surface stays 13.8°F+ above the dew point, no rain in the cure window.
- High condensation risk overnight — surface dips to within -1.5°F of the 27°F dew point (low 26°F, 4% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.
- Cold mornings (down to 33°F, floor is 50°F) — wait for the surface to warm past midday before you stain.
- High humidity (91%, over the 85% mark) slows drying — keep an eye on the cure window.
Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.
Why these thresholds
Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.
- • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
- • Air + surface in the 50–90°F band (low-temp lines to 45°F).
- • Humidity under 85%; ideally under 70%.
- • No rain for 24h after application.
- • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.
Free in the beta
Watch this job site 24/7
Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.