paint·day

Is it good to stain in Greensboro, NC this week?

A live 7-day go/no-go calendar for deck & fence stain in Greensboro, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Thu (Caution)
ThuCAUTION
84°/59°
Dew margin
8.7°F
Overnight dew
Low
Rain
0%
Window
10am–5pm

High humidity (92%, over the 85% mark) slows drying — keep an eye on the cure window.

FriRISK
88°/63°
Dew margin
-2.6°F
Overnight dew
High
Rain
7%
Window
—

High condensation risk overnight — surface dips to within -2.6°F of the 65°F dew point (low 62°F, 72% cloud, 7 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

SatRISK
74°/66°
Dew margin
0.5°F
Overnight dew
High
Rain
71%
Window
—

High condensation risk overnight — surface dips to within 0.5°F of the 56°F dew point (low 57°F, 100% cloud, 8 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

SunRISK
60°/57°
Dew margin
0.2°F
Overnight dew
High
Rain
68%
Window
—

High condensation risk overnight — surface dips to within 0.2°F of the 59°F dew point (low 59°F, 100% cloud, 4 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

MonRISK
80°/61°
Dew margin
0.4°F
Overnight dew
High
Rain
24%
Window
—

High condensation risk overnight — surface dips to within 0.4°F of the 58°F dew point (low 50°F, 5% cloud, 7 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

TueCAUTION
67°/50°
Dew margin
7.7°F
Overnight dew
Low
Rain
2%
Window
9am–5pm

Cold mornings (down to 50°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

WedCAUTION
70°/45°
Dew margin
3.2°F
Overnight dew
Watch
Rain
5%
Window
10am–7pm

Watch overnight dew — surface comes within 3.2°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

CautionThu — today & tonight
  • High humidity (92%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Greensboro

Deck & Fence Stain weather elsewhere in North Carolina