paint·day

Is it good to coat in Albany, NY this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Albany, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Sun (Caution)
SunCAUTION
87°/66°
Dew margin
4.4°F
Overnight dew
Watch
Rain
1%
Window
10am–5pm

Watch overnight dew — surface comes within 4.4°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

MonRISK
89°/71°
Dew margin
-0.7°F
Overnight dew
High
Rain
4%
Window

High condensation risk overnight — surface dips to within -0.7°F of the 61°F dew point (low 60°F, 0% cloud, 6 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

TueRISK
94°/72°
Dew margin
0.1°F
Overnight dew
High
Rain
63%
Window

High condensation risk overnight — surface dips to within 0.1°F of the 71°F dew point (low 71°F, 100% cloud, 2 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

WedRISK
98°/75°
Dew margin
-0.4°F
Overnight dew
High
Rain
16%
Window

High condensation risk overnight — surface dips to within -0.4°F of the 72°F dew point (low 72°F, 11% cloud, 3 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

ThuRISK
100°/83°
Dew margin
-3.6°F
Overnight dew
High
Rain
8%
Window

High condensation risk overnight — surface dips to within -3.6°F of the 74°F dew point (low 69°F, 78% cloud, 1 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

FriRISK
100°/83°
Dew margin
2.7°F
Overnight dew
Watch
Rain
21%
Window

Too hot — high of 100°F is well over the 86°F ceiling; the film skins over before it can level or adhere.

SatRISK
99°/82°
Dew margin
3.8°F
Overnight dew
High
Rain
44%
Window

High condensation risk overnight — surface dips to within 3.8°F of the 72°F dew point (low 76°F, 7% cloud, 2 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

CautionSun — today & tonight
  • Watch overnight dew — surface comes within 4.4°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
  • Hot afternoon (87°F, ceiling 86°F) — coat early and follow the shade.
  • High humidity (92%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5086°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Albany

Epoxy & Resin Floors weather elsewhere in New York