Is it good to coat in New York, NY this week?

A live 7-day go/no-go calendar for epoxy & resin floors in New York, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Sat (Good to go)
WedCAUTION
69°/61°
Dew margin
2.1°F
Overnight dew
Watch
Rain
2%
Window
10am–2pm

Watch overnight dew — surface comes within 2.1°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

ThuRISK
72°/63°
Dew margin
2°F
Overnight dew
High
Rain
5%
Window
—

High condensation risk overnight — surface dips to within 2°F of the 64°F dew point (low 64°F, 100% cloud, 6 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

FriRISK
82°/66°
Dew margin
3.7°F
Overnight dew
Watch
Rain
22%
Window
—

Rain likely in the 24h cure window (22% chance, ~6.6mm) — it can wash out or mar an uncured coat.

SatGO
70°/60°
Dew margin
6°F
Overnight dew
Low
Rain
12%
Window
8am–5pm

Clear to coat: temps 60–70°F, RH under 56%, surface stays 6°F+ above the dew point, no rain in the cure window.

SunCAUTION
66°/59°
Dew margin
4.7°F
Overnight dew
Watch
Rain
28%
Window
8am–5pm

Watch overnight dew — surface comes within 4.7°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

MonGO
71°/62°
Dew margin
16.3°F
Overnight dew
Low
Rain
13%
Window
8am–5pm

Clear to coat: temps 62–71°F, RH under 70%, surface stays 16.3°F+ above the dew point, no rain in the cure window.

TueCAUTION
58°/47°
Dew margin
22.3°F
Overnight dew
Low
Rain
0%
Window
11am–5pm

Cold mornings (down to 47°F, floor is 50°F) — wait for the surface to warm past midday before you coat.

CautionWed — today & tonight
  • Watch overnight dew — surface comes within 2.1°F of the dew point (margin is 5°F). Time the coat to dry well before evening.
  • High humidity (87%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–86°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in New York

Epoxy & Resin Floors weather elsewhere in New York