paint·day

Is it good to coat in Syracuse, NY this week?

A live 7-day go/no-go calendar for epoxy & resin floors in Syracuse, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayCautionBest upcoming window: Sat (Good to go)
ThuCAUTION
81°/70°
Dew margin
5°F
Overnight dew
Low
Rain
3%
Window
10am–5pm

High humidity (91%, over the 85% mark) slows drying — keep an eye on the cure window.

FriRISK
84°/67°
Dew margin
3.8°F
Overnight dew
High
Rain
6%
Window

High condensation risk overnight — surface dips to within 3.8°F of the 55°F dew point (low 58°F, 19% cloud, 1 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

SatGO
82°/63°
Dew margin
6.2°F
Overnight dew
Low
Rain
9%
Window
8am–5pm

Clear to coat: temps 63–82°F, RH under 78%, surface stays 6.2°F+ above the dew point, no rain in the cure window.

SunRISK
73°/68°
Dew margin
0.8°F
Overnight dew
High
Rain
69%
Window

High condensation risk overnight — surface dips to within 0.8°F of the 66°F dew point (low 67°F, 10% cloud, 4 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

MonRISK
79°/68°
Dew margin
2.3°F
Overnight dew
High
Rain
26%
Window

High condensation risk overnight — surface dips to within 2.3°F of the 55°F dew point (low 57°F, 11% cloud, 1 mph wind). A fresh coat can blush/blister. Stop 4h before dew falls.

TueGO
81°/63°
Dew margin
7.7°F
Overnight dew
Low
Rain
5%
Window
8am–5pm

Clear to coat: temps 63–81°F, RH under 78%, surface stays 7.7°F+ above the dew point, no rain in the cure window.

WedCAUTION
85°/68°
Dew margin
5.8°F
Overnight dew
Low
Rain
38%
Window
8am–5pm

Some rain risk (38%) during the cure window — re-check the radar before you start.

CautionThu — today & tonight
  • High humidity (91%, over the 85% mark) slows drying — keep an eye on the cure window.

Caution. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Installing within 5°F of the dew point causes amine blush / carbamation — a cloudy, greasy, hazed floor. The slab surface temp, not the air, is what counts.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 5086°F band (low-temp lines to 50°F).
  • • Humidity under 85%; ideally under 80%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert

Other coatings in Syracuse

Epoxy & Resin Floors weather elsewhere in New York