paint·day

Is it good to stain in Scottsdale, AZ this week?

A live 7-day go/no-go calendar for deck & fence stain in Scottsdale, built from the local forecast against the 5°F-above-dew-point rule. We lead with the signal a weather app misses: overnight condensation risk.

TodayHold offBest upcoming window: Thu (Good to go)
MonRISK
79°/58°
Dew margin
3.3°F
Overnight dew
Watch
Rain
54%
Window
—

Rain likely in the 24h cure window (54% chance, ~1.1mm) — it can wash out or mar an uncured stain.

TueRISK
65°/60°
Dew margin
4°F
Overnight dew
High
Rain
58%
Window
—

High condensation risk overnight — surface dips to within 4°F of the 45°F dew point (low 47°F, 0% cloud, 5 mph wind). A fresh stain can blush/blister. Stop 4h before dew falls.

WedCAUTION
69°/48°
Dew margin
10.1°F
Overnight dew
Low
Rain
0%
Window
9am–5pm

Cold mornings (down to 48°F, floor is 50°F) — wait for the surface to warm past midday before you stain.

ThuGO
73°/61°
Dew margin
12.7°F
Overnight dew
Low
Rain
8%
Window
8am–5pm

Clear to stain: temps 61–73°F, RH under 42%, surface stays 12.7°F+ above the dew point, no rain in the cure window.

FriGO
69°/62°
Dew margin
6.7°F
Overnight dew
Low
Rain
8%
Window
8am–5pm

Clear to stain: temps 62–69°F, RH under 38%, surface stays 6.7°F+ above the dew point, no rain in the cure window.

SatGO
68°/61°
Dew margin
5.2°F
Overnight dew
Low
Rain
0%
Window
8am–5pm

Clear to stain: temps 61–68°F, RH under 48%, surface stays 5.2°F+ above the dew point, no rain in the cure window.

SunGO
71°/60°
Dew margin
6.1°F
Overnight dew
Low
Rain
0%
Window
8am–5pm

Clear to stain: temps 60–71°F, RH under 45%, surface stays 6.1°F+ above the dew point, no rain in the cure window.

Hold offMon — today & tonight
  • Rain likely in the 24h cure window (54% chance, ~1.1mm) — it can wash out or mar an uncured stain.
  • Watch overnight dew — surface comes within 3.3°F of the dew point (margin is 5°F). Time the coat to dry well before evening.

Hold off. These are forecast numbers — confirm the surface temperature on-site before you start.

Why these thresholds

Stain applied to a damp or dew-wet board can't penetrate — it beads, stays tacky and flakes. Wood must be dry and stay above the dew point while it sets.

  • • Surface temp must stay 5°F above the dew point through application and cure (ASTM D3276 / ISO 8502-42).
  • • Air + surface in the 50–90°F band (low-temp lines to 45°F).
  • • Humidity under 85%; ideally under 70%.
  • • No rain for 24h after application.
  • • We use the forecast ground-surface temperature as a surface-temp proxy — confirm on-site with an IR thermometer.

Free in the beta

Watch this job site 24/7

Get an email the moment overnight dew, rain, or an out-of-range stretch threatens a fresh coat — and a morning digest with the best window ahead. No app to check; we watch the forecast for you.

Set up a free alert→

Other coatings in Scottsdale

Deck & Fence Stain weather elsewhere in Arizona